  • Building C Addition Underway

    In September 2013, Morton College initiated a project that will construct a ten room, two-story classroom addition along the west side of Building C.

    The addition (to be completed prior to Fall Semester 2016) will mark the first new facility construction since the campus opened in 1975.

    The new, approximately 15,000 square foot facility will consist of and will accommodate the following spaces:

    • Five (5) Learning Studios
    • Allied Health Classroom Early Childhood Education Classroom
    • Two (2) Adult Education Classrooms
    • Student Lounge Space
    • Conference Space

    The building exterior will be consistent with the aesthetic of the existing campus, and sustainable design strategies will be incorporated throughout in order to achieve LEED (Leadership in Energy and Environmental Design) certification.

    The design of the facility is currently being finalized and construction is expected to begin during the summer of 2015.